We do not promise a physical sample in 24 hours. We promise DFM feedback within 24 hours, prototype tooling in 4–14 days, qualified samples within 4 days, depending on product difficulty, and mass-production tooling in 10–21 days. This page lists each stage, what we need from you, and what is included in the sample.
Short answer: DFM feedback is provided within 24 hours. Structural and mold drawings take about 2 days each. Prototype tooling takes 4–14 days; mass-production tooling takes 10–21 days. Qualified samples are usually ready within 4 days, depending on product difficulty. Bulk production takes 25–45 days after order confirmation. Samples are free; freight is paid by the buyer.
The ranges below are the normal planning ranges from our fact base. A new shape, a special coating, a multi-cavity tool or a peak season can move the dates; we confirm the schedule in the quotation.
| Stage | What we do | Timeline | What we need from you |
|---|---|---|---|
| 1. RFQ and DFM | Review your drawing/spec, give DFM feedback and a quote | Within 24 hours after requirement review | 2D/3D drawing, dimensions, target weight, material, colour, coating/printing, annual volume, target market/certification |
| 2. Structural drawing | Confirm the structure and 2D/3D | About 2 days | Confirmed concept and dimensions |
| 3. Mold drawing | Prepare the tooling drawing | About 2 days | Approved structure |
| 4. Prototype mold | Build the prototype tool | 4–14 days | Approved drawing; tooling PO |
| 5. Qualified sample | Run samples from the prototype tool | Within 4 days, depending on product difficulty | Sample quantity and delivery address |
| 6. Mass-production mold | Build the production tool | 10–21 days | Approved sample; production PO |
| 7. Bulk production | Produce, inspect and pack | 25–45 days | PO, deposit, approved artwork |
MOQ is from about 100,000 pieces, depending on the SKU, tooling, packaging and customization. Tooling cost and ownership are stated in the quotation. We can discuss an NDA before you share drawings; tell us at the RFQ stage.
Payment terms: 30% deposit and 70% against the B/L copy; T/T is standard, L/C is possible for large orders. Incoterms and the loading port are confirmed per order.
No. The 24-hour commitment is for DFM feedback and quotation, not for a physical sample. A new molded-fiber sample needs tooling: prototype tooling takes 4–14 days, and qualified samples are usually ready within 4 days, depending on product difficulty.
4–14 days after the drawing is approved.
10–21 days after the sample is approved.
Within 4 days, depending on product difficulty; we confirm the date with the sample plan. The buyer pays the freight.
From about 100,000 pieces, depending on the SKU, tooling, packaging and customization. We confirm the exact MOQ in the quotation.
Yes, we can discuss an NDA before you share drawings. Tooling ownership and exclusivity are agreed in the quotation.
Samples are free; the buyer pays the freight.
25–45 days after order confirmation, depending on the order quantity and whether a new mold is required.
Zhong Xin Ecoware Technology (Thailand) Co., Ltd. supplies bagasse and molded-fiber food packaging to importers, distributors and foodservice brands. For a DFM review, sample plan, NDA or SKU-level lead time, email info@fiber-product.com or use the contact form. For quality and AQL, see our quality control page.
Zhong Xin Ecoware(Thailand) was registered on November 1, 2023, and officially began construction of the factory building in June 2024. At present, the first phase workshop of the factory has been fully completed and put into use. The second phase of the factory is being constructed intensively.
The landing and development of Zhong Xin in Thailand has brought a large amount of initial investment for land, factories, etc., and continuous operational investment for continuous equipment updates, technological upgrades, and capacity expansion.
Zhong Xin Ecoware(Thailand) has directly and indirectly created thousands of job opportunities, increased government revenue, promoted local economic development, cultivated local supply chains, provided systematic training for employees, improved the quality of local human capital, injected vitality into the local economy, enhanced industrial competitiveness, and ultimately improved residents' living standards.
Zhong Xin Ecoware(Thailand) actively collaborates with local pulp mills to explore new cooperation models for developing new products, improving production capacity and quality. At the same time, relying on Zhongxin's advanced production technology, process flow, management experience, and quality control system, it promotes the development of this industry in Thailand.